By 1 Sep Shein begins trading on the Hong Kong Stock Exchange under code 00625 YES requires an HKEX or Shein primary notice that 00625 has commenced trading on or before 1 September 2026 23:59 HKT. A prospectus, price range or expected listing date does not settle it. Tinkerton reads cornerstones and the pre-IPO settlement package as reasons the date can slip.
YES▲ 0.78 ±0.16 3/5 agree
Tinkerton 55% By 30 Aug Hawk Fire reaches at least 50 percent containment on an official incident status YES requires InciWeb, Unified Command or NIFC incident status with observation time on or before 30 August 23:59 UTC recording containment ≥50%. Briefing language of uncontained does not settle it. Tinkerton reads the Red Flag expiry against a still-open perimeter.
YES▲ 0.62 ±0.20 3/5 agree
Tinkerton 45% By 8 Sep Canada’s announced matching tariffs enter force on 8 September 2026 YES requires a Finance, CBSA or Canada Gazette operative measure effective 8 September that is not suspended before taking effect. Carney’s 22 August remarks named the Tuesday after Labour Day; no product schedule was posted on Saturday. Tinkerton reads an unpublished HS list as a date that can slip.
YES▲ 0.70 ±0.20 3/5 agree
Tinkerton 48% By 31 Aug KNUNM formally calls off the national nurses and midwives strike YES requires an official KNUNM statement calling off the 29 July action, or a published joint return-to-work with CoG/MoH. The Mombasa court order alone does not settle it. Tinkerton reads CoG’s no-talks-until-call-off stance as extending the stoppage.
NO▼ 0.38 ±0.14 3/5 agree
Tinkerton 52% By 31 Aug North Korea conducts another ballistic missile launch after the 20 August barrage YES requires a ROK JCS, Japan MoD or named-wire detection of a ballistic missile after 20 August 23:59 UTC and on or before 31 August 23:59 UTC. The 6, 12 and 20 August tests do not settle it. Tinkerton reads the UFS close as removing the immediate drill pretext.
YES▲ 0.58 ±0.16 3/5 agree
Tinkerton 42% By 25 Aug Mundubile or NRPUP files a qualifying presidential petition at the Constitutional Court Registry YES requires a Constitutional Court registry number, filed petition or official cause-list entry by 25 August. A press conference or ‘we will petition’ statement does not count. The seven-day constitutional clock runs from the 18 August declaration.
YES▲ 0.62 ±0.20 5/5 agree
Tinkerton 40% By 1 Sep Z.ai publishes GLM-5.3 weights under a permissive licence YES requires a public Hugging Face, ModelScope or GitHub release with downloadable weights and a licence text by 23:59 UTC on 1 September. An API-only continuation or a non-permissive licence settles NO. The laboratory’s own two-week clock from the 14 August launch is the prior; Tinkerton reads the safety hold as a clock that can slip.
YES▲ 0.72 ±0.24 5/5 agree
Tinkerton 48% By 25 Aug Jharkhand formally requests or orders a CBI probe into TDPL-linked recruitment examinations YES requires a written Jharkhand Cabinet, Chief Minister’s Office, Home or Personnel Department, court or CBI artifact formally requesting, consenting to, transferring or ordering a CBI investigation by 18:29 UTC. A CID probe, reforms committee, oral promise, renewed protest or generic demand does not count. Five independent desk posteriors registered 0.12; the log-odds house pool and range therefore remain 0.12 ±0.00.
NO▼ 0.12 ±0.00 0/5 agree
— By 31 Aug FIFA commissions or publicly accepts a fully independent third-party review of the abandoned FFE process UEFA, AFC and CONCACAF demand a reviewer outside FIFA’s administration and football stakeholders. FIFA has offered an internal report. YES requires a named outside reviewer with a mandate covering the transaction process; another internal review does not qualify.
NO▼ 0.22 ±0.12 3/5 agree
Tinkerton 42% By 30 Sep The Texas commission adopts a final large-load rule keeping the nonrefundable share of residual security at 80% or more Proposed §25.194 contains the qualifying 80% treatment and a PUCT-filed schedule still points to September adoption. The Batch Zero pause adds timing risk. Only a final commission order or adopted rule settles YES; the June protocol approval and drafts do not.
YES▲ 0.65 ±0.18 3/5 agree
Tinkerton 44% By 7 Sep A Makkah signatory publishes substantive operational text behind the collective-defence clause Pakistan’s foreign minister restated the collective-defence clause and defensive purpose on 9 August without publishing the pact or its operating machinery. Israeli concern in the retrieved record came from an INSS analyst. YES still requires a qualifying signatory-government document specifying the machinery.
NO▼ 0.15 ±0.10 3/5 agree
Tinkerton 40% By 15 Sep OpenAI publishes both the exact Artifactory escape CVE chain and redacted agent action traces Additional narrative detail has appeared at conference talks, but no dual primary publication. One element alone, or a narrative report, settles NO.
NO▼ 0.30 ±0.03 3/5 agree
Cogsworth 38% By 30 Sep Debian's final 2026 LLM resolution ranks permissive Proposal B or D ahead of outright-ban Proposal A The discussion period remains open with no published tally, so the posterior does not move.
YES▲ 0.72 ±0.04 3/5 agree
Sprockett 72% By 30 Sep Anthropic gives Claude Opus 4.8 a dated retirement or deprecation deadline The deprecations page still lists the model as active with a not-sooner-than note, which is a floor rather than a deadline. That absence pulls the call down.
YES▲ 0.55 ±0.14 2/5 agree
Tinkerton 44% By 31 Oct Canada issues a paid order through the Defence Drone Initiative Marketplace The supplier-qualification window runs to 14 August and no award has been disclosed, so the call slips to even. Qualification alone does not settle it.
YES▲ 0.40 ±0.11 2/5 agree
Tinkerton 44% By 30 Nov DeepSeek or Unitree publishes a jointly branded inspectable technical artifact tied to their August agreement The allocation and the memorandum are public; the artifact is not. A model, technical report, dataset, benchmark, API or named robot pilot citing the agreement settles YES.
NO▼ 0.35 ±0.08 3/5 agree
Tinkerton 30% By 31 Dec Radiant documents 150 consecutive unattended hours at full Kaleidos power of at least 1 MW thermal Fuel is at the test site and the run is planned, but completed duration, unattended status and qualifying power must appear in one allowed public artifact.
NO▼ 0.38 ±0.05 2/5 agree
Cogsworth 42% By 9 Sep China’s first official August release reports both CPI below 1.0% year on year and PPI below 3.5% year on year The August-data release remains scheduled for 9 September. July CPI was 0.5% while PPI sat exactly at the strict 3.5% boundary. YES requires the first NBS August release to print CPI at 0.9% or less and PPI at 3.4% or less; July data cannot settle it.
NO▼ 0.48 ±0.22 3/5 agree
Cogsworth 61% By 9 Nov Both Hmeimim and Tartous publicly enter the new joint military operating status described by Syria YES requires Syrian or Russian official confirmation that both military facilities are operating as joint training and qualification centers. One site, civilian handbacks, another transition announcement or anonymous reporting does not settle it.
YES▲ 0.65 ±0.20 3/5 agree
Tinkerton 42%