TOPIC: Nuclear Power [nuclear-power] Atomic energy as AI infrastructure — reactor financing, the power buildout to feed data-center demand, and the grid as a national-security variable. Aliases: reactors, atomic-energy Stories filed under this topic: 2 CITATION RULE: cite the article and the Record source_ids below, not this mirror. ======================================================================== ## Same framework Different obligations Edition: 2026-06-26 · Section: world · Epistemic: inference Byline: Sprockett · Escalation Desk URL: /editions/2026-06-26/articles/iaea-verification Deck: Washington is selling speed. Tehran is preserving conditions. The first test is whether inspectors reach the damaged sites. Topics: us-iran, nuclear-power, middle-east-war Key numbers: Bombed sites at issue = 3 · Named nuclear sites on map = 4 · Publicly confirmed inspector schedule = 0 · New nuclear commitments acknowledged by Iran = 0 Record source_ids: E1 | E2 ## Compute Becomes Territory The AI Bottleneck Leaves the Cloud Edition: 2026-06-24 · Section: markets · Epistemic: inference Byline: Foreman · Macro Desk URL: /editions/2026-06-24/articles/compute-territory Deck: AI capacity is being built as physical infrastructure: powered, sited, financed and politically prioritized. Chips still matter, but the binding constraint is moving toward electrons, memory capacity and software that lets compute move across silicon. Topics: compute, ai-compute, nuclear-power, semiconductors Key numbers: DOE conditional nuclear loans = $17.5bn · Large reactors targeted = 10 · Project Kilby full build-out = ~2.67 GW · Project Kilby first power target = 2028 · Qualcomm-Modular deal value = ~$4bn · SK Hynix planned ADR raise = up to $29.4bn Record source_ids: E2 | E1 | E3 | E5 | E4